Local Integration Partner for EPCs Delivering BESS & Solar in Australia
Grid compliance, WHS/IR mobilisation, and construction oversight — ISO-aligned, Zero Harm
PARX ENERGY is a Melbourne-based project management and EPC integrator, specialising in Battery Energy Storage Systems (BESS), Utility Solar, and Grid-Connection Projects. We partner with global EPCs and local developers to deliver compliant, safe, and efficient outcomes in Victoria and across the NEM.

25+ years experience in heavy industry and renewables

Trusted advisor to global EPCs (including Chinese partners)

ISO-aligned systems (9001, 45001, 14001)

Zero Harm safety record
- Meet the Founder
Peter Rakovic

“Founded on 25 years of Australian construction & engineering excellence.
Case Studies
Committed to a cleaner future, we empower businesses, governments, and communities to transition to sustainable energy systems while reducing costs and environmental impact.
Owner’s Engineer
-
Grid connection negotiation (AEMO/DNSP)
-
Hold-point testing oversight
-
Independent design review
-
Compliance assurance
-
Compliance assurance

Project Management

-
Program & cost control
-
Risk registers & change-order management
-
Stakeholder reporting
-
HSEQ governance
Construction Management
-
Subcontractor oversight
-
WHS & IR mobilisation
-
HV substation/BOP supervision
-
Civil & electrical interface management

Specialist Advisory
-
Grid & compliance audits
-
WHS & mobilisation advisory
-
Project governance & controls
-
Retainer model (1–2 days/week)

EPC Integration (EN/中文)

Trusted Partner for Australia’s Renewable Future
25+ years of proven expertise in power, renewables, and infrastructure
Zero Harm, ISO-aligned systems for safety, quality, and sustainability
Global EPC partner (EN/中文) bridging compliance, grid, and IR in Australia
Capital-light, scalable model delivering cost certainty and investor confidence
FAQ
Questions & answers
Looking for answers? Explore our help section or contact us if you need more support.
Who is PARX ENERGY?
PARX ENERGY is an Australian project and construction management firm focused on grid-scale renewables—Battery Energy Storage Systems (BESS), utility solar, and HV substations—serving developers and EPCs across the NEM.
Entity: The Trustee for the PARX Trust (ABN 17 433 132 012) • Registered Office: Level 3, 534 Church Street, Richmond, VIC 3121, Australia.
Builder licence: CB-L 37312 (Commercial Builder – Limited).
What services do you provide?
-
Owner’s Engineer: Grid connection (AEMO/DNSP), hold-point testing oversight, independent design review, compliance.
-
Project Management: Program & cost control, risk/change management, stakeholder reporting, governance.
-
Construction Management: Site mobilisation, WHS & IR interface, HV substation/BOP supervision, civil/electrical interfaces.
-
EPC Integration (EN/中文): Local compliance and delivery partner—especially for Chinese EPCs.
-
Specialist Advisory: Grid & compliance audits, WHS & mobilisation, project controls; retainer model (1–2 days/week).
Which projects have you worked on?
Representative experience includes Waratah Super Battery (NSW, 850 MW/1,680 MWh), 50 MW utility solar (VIC), 5 MW community battery (VIC), a confidential WA power station turnaround, an international hybrid renewables project, and a VIC/NSW battery pipeline (≈1 GWh).
How do engagements run and where do you operate?
Model: Capital-light leadership + SME bench; clear SoW or micro-scopes → mobilisation → delivery & reporting.
Coverage: Melbourne-based, active across Victoria and the NEM; selective international advisory.
Bilingual: English/中文. IR: Proactive union/workforce engagement.
What about systems, safety, and insurance?
ISO-aligned: 9001 (Quality), 45001 (WHS), 14001 (Environmental). HSEQ: Zero Harm; KPIs include LTIFR = 0, on-time deliverables, >90% client satisfaction.
Insurance: Public Liability, Professional Indemnity, Workers’ Comp—being bound; certificates available on request.
How do we start and what documents are available?
Email [email protected] or use the RFP form; auto-acknowledgement within 24 hours.
Docs: Vendor Prequalification Pack, Case Study Packs (3 & 6), Policy one-pagers (Quality, WHS, Environmental, Sustainability, Privacy, Terms), and ISO manuals (plain-text masters).
General: [email protected]